Property Component Types define building elements such as kitchens, bathrooms, roofs and windows. Each has a Standard Cost and Life Cycle used by Asset Management to forecast replacement costs and produce Stock Condition reports.
Opening Property Component Types
- Open Admin → Settings.
- Under General Settings, choose Add-ons.
- Select Asset Management, then Property Component Types.
Asset Management is an optional add-on. Contact Affinity Support if your organisation needs it enabled.
Adding a Component Type
- Select Add Component.
- Enter a unique Component name, up to 64 characters.
- Enter Standard Cost, the typical replacement cost in the currency shown.
- Enter Life Cycle (Years), the expected number of years before replacement.
- Select Add.
All three fields are required. The new type becomes available for Asset Management Profiles and property assignments. The list is alphabetical and shows each type’s cost and life cycle.
Editing a Component Type
- Open Property Component Types and select the component.
- Open Options → Edit Component.
- Change the name, standard cost or life cycle.
- Select Update.
Changes to a type affect the default values used wherever it is assigned, including forecasts and Stock Condition reports. For a property with a different replacement interval, record an Adjusted Life Cycle against that property’s component.
Deleting a Component Type
- Open the component from the list.
- Choose Options → Delete Component.
- Confirm the deletion.
Deletion makes the type inactive and removes it from the catalogue for new assignments. It also removes the type from Asset Management Profiles.
If it is already assigned to a property, the property’s component is retained and labelled Inactive, preserving its information and inclusion in relevant forecasts and reports. It can be removed from the property, but cannot be newly assigned or added back after removal.
Default Property Component Types
The supplied catalogue provides a starting point. Your organisation’s names and values may differ after administrators have updated them.
| Component | Standard Cost | Life Cycle |
|---|---|---|
| Bathroom | 5,900.00 | 30 years |
| Gas Boiler | 3,700.00 | 15 years |
| Oil Boiler | 4,500.00 | 15 years |
| Heat Pump | 5,600.00 | 15 years |
| External Doors | 2,900.00 | 30 years |
| Rewiring | 6,500.00 | 30 years |
| Smoke/CO2 Detectors | 300.00 | 10 years |
| Kitchen | 5,800.00 | 20 years |
| PV Panels | 5,000.00 | 20 years |
| Windows (7 per property assumed) | 5,250.00 | 40 years |
| Roof | 8,000.00 | 50 years |
| Cyclical repainting | 3,000.00 | 7 years |
Keeping Forecasts Useful
Review costs as labour and material prices change, and review life cycles when replacement policies change. Use clear names and check the catalogue before adding another type. Consider the effect on profiles, properties and reports before deleting a type.
See Asset Management Profiles for applying a reusable selection of components to properties.